Blog
-
Oracle EPM Cloud Update – Jan’22 (22.01)
- January 7, 2022
- Posted by: PARC Oracle EPM Team
- Categories: Cloud Computing, Oracle
No CommentsThese Oracle EPM updates are scheduled to take place during the first nightly maintenance period on or after 2AM ET on Saturday Jan 8, 2022 (test environments) and on or after 2AM ET on Saturday, Jan 22, 2022 (production environments)
-
Oracle EPM Cloud Update – Dec’21 (21.12)
- December 2, 2021
- Posted by: PARC Oracle EPM Team
- Categories: Cloud Computing, Oracle
These Oracle EPM updates are scheduled to take place during the first nightly maintenance period on or after 2AM ET on Saturday Dec 3, 2021 (test environments) and on or after 2AM ET on Saturday, Dec 17, 2021 (production environments).
-
Oracle EPM Cloud Update – Nov’21 (21.11)
- November 3, 2021
- Posted by: PARC Oracle EPM Team
- Categories: Cloud Computing, Oracle
These Oracle EPM updates are scheduled to take place during the first nightly maintenance period on or after 2AM ET on Saturday Nov 5, 2021 (test environments) and on or after 2AM ET on Saturday, Nov 19, 2021 (production environments).
-
Block Creation in Essbase – Part 2
- October 22, 2021
- Posted by: Paul Hoch
- Categories: Hyperion, Oracle
The previous post ended with a discussion on using DATACOPY to create blocks. I stated that it was my preferred method of making sure the right blocks were created for use. However, we may run into a situation requiring an “IF” test to determine when we create the blocks. In this situation, we cannot use DATACOPY as it is not syntactically valid inside an IF test.
-
Block Creation in Essbase – Part 1
- October 14, 2021
- Posted by: Paul Hoch
- Categories: Hyperion, Oracle
A data block is the fundamental unit of storage for a cube in Essbase or Planning (including Planning Cloud). When developing a new calculation or updating an existing calculation, inevitably, block creation will become an issue for us. When writing calculations, you need to be sure that the data blocks either already exist or that they get created as part of your calculation; otherwise, you’ll end up without the data you need.
-
Oracle EPM Cloud Update – Oct’21 (21.10)
- October 1, 2021
- Posted by: PARC Oracle EPM Team
- Categories: Cloud Computing, Oracle
The below Oracle updates are scheduled to take place during the first nightly maintenance period on or after 2AM ET on Saturday Oct 2, 2021 (test environments) and on or after 2AM ET on Saturday, Oct 16, 2021 (production environments).
-
Oracle EPM Cloud Update – Sep’21 (21.09)
- September 2, 2021
- Posted by: PARC Oracle EPM Team
- Categories: Cloud Computing, Oracle
The below changes are scheduled to take place during the first nightly maintenance period after 2AM ET on Saturday Sept 4, 2021 (test environments) and on or after 2AM ET on Saturday, Sept 18, 2021 (production environments).
-
Oracle EPM Cloud Update – Aug’21 (21.08)
- August 4, 2021
- Posted by: PARC Oracle EPM Team
- Categories: Cloud Computing, Oracle
The below changes are scheduled to take place during the first nightly maintenance period after 2AM ET on Saturday Aug 7, 2021 (test environments) and on or after 2AM ET on Saturday, Aug 21, 2021 (production environments).
-
Updating Existing Oracle 11.2.4 and 11.2.5 to 11.2.6
- August 3, 2021
- Posted by: Tony Moyers and Luis Castillo
- Categories: Cloud Computing, Oracle
Oracle has released 11.2.6 with some important security fixes and some new features. These updates will now be planned once a quarter – they are expected to be released about the same time as the Critical Patch Updates notifications happen. They are to contain all the patches to-date needed (Hyperion and the supported technologies – WebLogic, FMW, etc.).
-
Oracle EPM Cloud Update – July’21 (21.07)
- July 1, 2021
- Posted by: PARC Oracle EPM Team
- Categories: Cloud Computing, Oracle
-
Oracle EPM Cloud Update – Jan’22 (22.01)
These Oracle EPM updates are scheduled to take place during the first nightly maintenance period on or after 2AM ET on Saturday Jan 8, 2022 (test environments) and on or after 2AM ET on Saturday, Jan 22, 2022 (production environments)
January 7, 2022 Read more -
Oracle EPM Cloud Update – Dec’21 (21.12)
These Oracle EPM updates are scheduled to take place during the first nightly maintenance period on or after 2AM ET on Saturday Dec 3, 2021 (test environments) and on or after 2AM ET on Saturday, Dec 17, 2021 (production environments).
December 2, 2021 Read more -
Oracle EPM Cloud Update – Nov’21 (21.11)
These Oracle EPM updates are scheduled to take place during the first nightly maintenance period on or after 2AM ET on Saturday Nov 5, 2021 (test environments) and on or after 2AM ET on Saturday, Nov 19, 2021 (production environments).
November 3, 2021 Read more -
Block Creation in Essbase – Part 2
The previous post ended with a discussion on using DATACOPY to create blocks. I stated that it was my preferred method of making sure the right blocks were created for use. However, we may run into a situation requiring an “IF” test to determine when we create the blocks. In this situation, we cannot use DATACOPY as it is not syntactically valid inside an IF test.
October 22, 2021 Read more